Private by construction: every calculation happens on this page, on your device. Nothing you type is sent anywhere — there is no server holding your numbers, no account, and no sign-in.
The numbers pre-filled below are one example load — the same load used in our short video: 750 loaded miles at $2.10. Replace every figure with your own load. The detention terms (free time, hourly rate) are assumptions too — use the terms in your own rate confirmation.
The load
What the load pays, and every mile it takes — loaded and empty.
The clock
Detention terms
From your rate confirmation or carrier agreement. The defaults are common terms, not a promise that your load carries them.
What the load really pays
Keep the evidence
Detention is won or lost on records: arrival times, door times, what was promised against what was paid. The Pro Pack's rate-history log keeps offered-vs-taken rates; a simple load log — date, facility, in/out times, detention billed and paid — is the paper trail a detention claim stands on. Tracker & log: Know Your Mile — Monthly Cost Tracker & Rate History Log, $27 one time.
How this is calculated
Every formula, in plain English. The pre-filled numbers are an example — the formulas are the real content.
- Why hours, not miles: a load board quotes miles because miles are what the freight moves. Your life is spent in hours — driving them and waiting through them. This page prices the hours.
- Detention owed is your paperwork's number, not this page's opinion: the free time and the hourly rate come from your rate confirmation or carrier agreement. If yours says no detention, the honest owed figure is $0 — set the rate to 0 and the page will show you what the waiting cost your hourly pay anyway.
- What is not in these numbers: taxes, lumper fees, tolls beyond what your cost per mile already carries, and any accessorials besides detention. Add what a load really cost you to the cost-per-mile side.
- Company drivers: your cost per mile is your employer's problem, but the clock math is yours — set cost per mile to 0 and the per-hour figures become gross pay per hour on the load.